-
Aboutstick to the law of‘Weigh up for self-improvement’, and shoulder the responsibility of ‘make rubber for the world’. -
NewsToday Hengxiang Technology, information express. -
TechnologyScience and technology prosper business, innovation and development. -
Industry fieldCarry quality and safety, build long-term trust. -
ExamplesHengxiang Technology the heavy equipment supports super engineering. -
Party buildingFocus on party building around management, and do a good job of promoting party building. -
Talent1200 employees, including 330 senior engineers and technicians, and 11 senior engineers. -
ContactJoin Hengxiang Technology,: Hengxiang Technology, navigation for your life;<br> Select Hengxiang Technology,: Hengxiang Technology, technology quality escorted engineering.
ENGINEERING EXAMPLE
工程实例
undefined
Beijing Shanghai high speed railway - high speed railway support
Time of issue:
Origin:
Author:
xjgf

The picture shows the Nanjing Dashengguan Yangtze River Bridge on the Beijing Shanghai high-speed railway, which is known as the "first bridge" on the Beijing Shanghai high-speed railway. The Beijing Shanghai high-speed railway under construction is the world's first high-speed passenger trunk line with the highest speed and longest mileage. It was started in April 2008 and opened to traffic in 2012. The construction of the high-speed railway has shortened the direct time from Beijing to Shanghai to 5 hours, which is about half of the operation time of the current Beijing Shanghai EMU. In November 2008, in the procurement bidding of bridge bearings for Beijing Shanghai high-speed railway, our company won the bid for more than 200 million bridge bearings and became one of the important construction units of the project.
Nanjing Dashengguan Yangtze River Bridge is known as the "first bridge" on the Beijing Shanghai high-speed railway. It is only 1.55 kilometers away from the upper reaches of the third Nanjing Yangtze River Bridge and about 20 kilometers away from the upper reaches of the Nanjing Yangtze River Bridge. With a total length of about 9270m, it is a six span continuous steel truss arch bridge with a main span of 2 × 336m, the double arch is the largest span of similar bridges in the world, and the bridge is arranged in six lines, including Beijing Shanghai high-speed railway double line, Shanghai Wuhan Chengdu railway double line and Nanjing Metro double line; Among them, the design speed of Beijing Shanghai high-speed railway is 300 kilometers per hour, the Shanghai Wuhan Chengdu Railway is a class I trunk line with mixed passenger and freight lines, the design speed of passenger cars is 200 kilometers per hour, and the speed of Nanjing Metro is 80 kilometers per hour. There are four 15m intervals within 60m on both sides of the three main piers, and the rest are 12m long. The vertical rods are arranged vertically. Due to the vertical curve of the bridge deck, the symmetry of the arch span structure should be taken into account. The two nodes of the main pier in the near 7 # bridge are adjusted to 15.72m, and the length of the remaining nodes is still 12m.
The total investment of the project is 4.56 billion yuan, and the construction period is from July 2006 to November 2009. It will be opened to traffic in 2010.
In November 2008, in the bidding for the procurement of bearings for the civil works of Beijing Shanghai high speed railway, our company won the bid for more than 200 million bridge bearings, becoming one of the important construction units of the project.
Address:No. 9 East Road, North Industrial Base Park, Hengshui City
-
Phone:0318-2250005 Fax:0318-2993847
- Contact us | Business email | Ding Ding Office
-
COPYRIGHT @2019 HENGXIANG TECHNOLOGY 冀ICP备14016668号-3 Powered by:www.300.cn Beijing SEO
The public